1 analysis of castings
|
Page 2
9th Feb 2022 YouTube lists
10th Feb
Castings arrived
13th Feb
Volumes 109 109 and 110 delivery by Tom
14th Feb
Started scanning articles
15th Feb More
scanning
16th Feb More
scanning and arrival of a parcel of steel from Reeves
17th Feb
Listing of parts ordered from the Laser cutters
18th Feb Scale
conversion template made
|
Page 3
20th Feb 2022 Metal parts blued with marking out liquid
22nd Feb timber
from workshop found to make former for boiler flange
plates
23rd Feb Tender
steel considered
24th Feb
considering the motion plate
25th Feb
watching YouTube videos
26th Feb more
consideration
27th Feb
Considered the boiler construction
28th Feb Silver
solder ordered
Order
for laser cut part made to Model Engineers Laser Ltd
1st March 2022
Metal for tube plate marked out
3rd March
Flanging of tube plate
5th March
purchase of new jig saw to cut metal
6th March
Flange plate cleaned up.
|
7th March
2022 marking out of another boiler plate
8th March first hole cut with jig saw
12th March Start of the machining of the driving wheels
14th March attention to lathe
15th March more wheel turning
16th March More wheel turning
17th March Driving wheels (3) finished to size.
|
19th March 2022
New measuring gauge used
20th March marking out prior to boring the cylinders
21st March Boring out cylinders
23rd March Ports marked out
24th March Ports machined
25th March Machined the steam ports
|
26th March
2022 End caps
28th March End
caps again
29th March -
3rd April Fitting DRO to mill
4th - 9th April
more of fitting of DRO
10th - 12th
April more fitting DRO
13th April
final part of fitting the DRO
16th April
machining top to Steam Chest
17th April More
of Steam Chest top
|
17th April
Steam Chest
18th April all
done steam chest machining
19th April
marking out the steam chest top
20th April
marking out of top
21st April
Centre punched
22nd tapping
size Holes drilled
23rd more
tapping holes and clearance holes drilled
26th bolts cut
short as studding, exhaust hole drilled
27th Steam
chest spacer
30th April
marking out cross drilling
3rd May
drilling exhaust cross ports
|
4th May 2022
marking out the inlet ports
7th May setting up for drilling steam ways
10th May replacement and final wheel castings arrived and
was machined.
25th May more machining of wheels
26th More machining of driving wheels
27th finishing the driving wheels and bringing the tender
wheel to over all size
|
28th May 2022
amending the plan for trailing wheels. Finishing off the
tender wheel profiles
Machined the Trailing Wheels ready to bring to diameter
and profile
29th May Trailing wheels profiled completed.
All wheel completed except for final fettling
30th May Fettling
31st May Repairs to Dynamometer Car
4th June checking concentricity of the 3 jaw self
centering chuck
making the tender axles and cross drilling
Similarly making the trailing axle
5th June machining the driving axle without crank
7th June tidying up some of the flashing on the wheels
|
10 June 2022
considering the crank axle and cranks
14th June Completed sorting out the castings and adding
photos to page 1
16th June considering the eccentrics
23rd June Eccentrics blanks cut from bar and one machined.
25th June two more eccentrics machined.
26th All eccentrics machined and marked for the offset
final
eccentric made and all marked for the offset hole
29th June considering the eccentric straps
2nd July Suds pump repair
6th
July the lost eccentric found !!
23 July Considering the boiler again
24 August considering the machining of the Eccentric
straps
|
Page
11
30th
Aug 2022 Started
the machining of the Eccentric Straps
31 Aug all four
eccentrics straps part machined
|
8th September 2022
As a mark of respect work on my loco was suspended until
after the funeral of Queen Elizabeth II which took place
on 19th September 2022
RIP QEII
1st October Re-start of the build with the eccentric
straps
3rd Oct tapping the holes
4th Oct cutting in half
|
Page 14
10th
Oct 22 boring offset in eccentric
13th Oct 22 the next eccentric bored
|
Page 15
Re-start of the build 1 April 2023
I cut up the necessary steel for the loco frames
and for the 8 angle pieces.
3rd April Deciding where to place the holes in the angle
pieces.
8th April Marking out of the cylinder support brackets.
22nd
April holes drilled in plates
|
Page
16
22nd
April second side fitting to cylinder block all
necessary drilling and taping done and bolts fitted.
25th April Drilling the angle pieces
25
April The remaining 32 holes were drilled in the angle
pieces.
27
April working out what to do with the motion plate.
28th April a bad day !!
29th April The cylinder supports were joined to
the motion plates.
|
Page 17
29th
April continued
the
four corner fixed
30th
April the angles to support the cylinder block are
glued
1st
May 2023 the final angle pieces drill and the
chassis assembled and turned the correct way up
Considered
the next pieces the horn plates
2nd
May 2023 the horns were glued together.
Making
out fluid applied
3rd
May 2023 the position of the horns was marked out.
Considering
the material needed and rivets
5th
May 2023 made up M3 to 3/8" UNC for new mill cutters
8th
May 2023 the remaining holes in the axles horns drilled.
|
Page 18
8th May 2023 the next stage
will be machining the axle boxes.
9th May 2023 the plan for the
5" axles box extracted from plan.
10th
May 2023 The recesses in the axle bows was completed.
14th
May 2023
Trailing
axles boxes machined.
The
crank black were machine to size.
18th
May 2023
The
crank blanks ready for drilling.
19th
May 2023 Cranks reamed out to size.
20th
May 2023 four fresh piece of crank steel were cut ready
to machine.
22nd
may 2023 with the arrival in the post from RDG tool of
my centre finder the procedure and set up was checked
ready to do machining!
30th
May 2023 the cranks were drilled.
|
Page 19
31st
May 2023 Considering the crank axle.
1st
June 2023 the two cranks were put together with their
centre pieces.
3rd
June 2023 the remaining parts of the crank axle machine
and one part has adhesive applied.
5th
June 2023
Remade
part I dropped on the floor and completed the eccentric
centres.
7th
June 2023
Eccentrics
drilled and tapped M4
23rd
June 2023
drilling
holes of oil way in eccentric sheaves
1st
July 2023
Fitting
of axle horns to frame steel.
7th
July 2023
Supply
of steel arrived and more done to horns
9th
July 2023
parts
cut for trailing horn
13th
July 2023
leading
horns soldered
14th
July 2023
a
bit of filing done
|
Page 20
7th
August recovering from a trip to hospital.
29th December not yet re-started build !!!
|
|